Housing procurement runs on volume and certification. Hundreds of identical entrance door sets per scheme. Mandatory PAS 24 compliance under Part Q. Local authority procurement teams asking for Secured by Design on top. And the door has to look like the front door of a home, not a vault door retrofitted to a hallway.
Fort Engineering manufactures for housing associations, social housing developers, local authority housing teams, build-to-rent operators, and the regeneration scheme architects working across UK boroughs. Same factory, same engineering team, same certification scheme for a 12-unit infill as for a 400-unit regeneration block.
The scheme size differs. The manufacturing standard does not.